- page 29

Board Meeting, August 2nd

  • Open Board Meeting, August 2, 2018, at 7 PM in the Association Office.
    • Agenda for the meeting: (Subject to change)
      • Discuss 2nd Quarter 2018 Financial reports
      • Discuss water restrictions
      • Appoint new Board Members to fill vacancies
      • Select new Board Secretary
      • Discuss loose dogs
    • Executive Session to follow

 

Joe Pool Lake Master Plan Public Meeting July 31

Joe Pool Lake Master Plan Public Meeting July 31

The Fort Worth District, U.S. Army Corps of Engineers (USACE) will be hosting a public meeting at 6 p.m. Tuesday, July 31, 2018, at the Summit, 2975 Esplanade, to provide information and receive public input toward the final draft revision of the Master Plan for Joe Pool Lake. At the conclusion of a brief presentation, there will be an opportunity for the public to view maps, ask questions and provide comments about the Joe Pool Lake Master Plan.

For more information, visit the U.S. Army Corps of Engineers Fort Worth website: https://www.swf.usace.army.mil/Media/News-Releases/Article/1580247/corps-to-host-public-meeting-for-the-joe-pool-lake-master-plan-revision/

Help GP Save Water

 
To keep the city’s water supply at a safe level and to comply with the city’s whole sale water purchase contracts, the following restrictions apply at all times:
  • No watering between 10 a.m. and 6 p.m.
  • No watering on Wednesday, Saturday or Sunday.
  • Even numbered addresses may water on Mondays and Thursdays.
  • Odd numbered addresses may water on Tuesday and Fridays.
  • When watering, a constant stream of water should not be allowed to flow into the street drainage.
  • Watering during precipitation is prohibited. Rain sensors are required on newer watering systems.

Utility Work on the West Side

J&S Underground Networks are starting work today to install conduits for new underground power cables.

This work will be from West Creek Lane to West Mountain Lane between the transformers.  If they are doing it like they did on the East side, they will get the new conduits and cables in place at the transformers to minimize the downtime without power while they swap cables.

 

Addition to Pool Rules

Due to a recent event, we have added a new item to our current Pool Rules.

Absolutely no plug-in devices (120 volt) will be allowed within the pool area.

All 120 volt outlets within the pool fence are for HOA Pool staff use, such as the Auto Vac or fans for our Pool Monitors.

These outlets are not for electric grills, radios, or other 120 volt items brought into the pool area by homeowners and/or their guests.

 

More Electrical Work on West Side

J&S Underground Networks, Inc. and Pike Electric will be on property next week doing some extensive work on the underground electrical cables running across the entire West side of the property, from West Creek Lane to West Mountain Lane.

They are replacing the feeder cables between transformers, and in some cases, the transformer itself. Most of these cables and some equipment are the original installed in the early 1970’s. Conduits will be installed with a hydraulic boring machine so they can more easily replace cables in future.

They estimate they will be working for a little over a week.