This lot will be replaced the week of November 8th.
New Retaining Wall and Sidewalk at the Pool, Spring 2019
Sidewalk smoothedSidewalk finishedFinished retaining wallBuilding a retaining wallSidewalk pour
Pool Pergola, May 2018
Pergola on East Side, Spring 2018
Trees and shrubs, Spring 2017
Pool Bathroom Updates – 2016
Women’s RoomWomen’s Room
Men’s Room Updates
New Sidewalk, West Townhouse Lane -2016
BeforeAfter
New Sidewalk, West Townhouse Lane – 2015
Forms and re-barTroweling after pouring concreteFinished with a brush
New Sidewalk, West Mountain Creek Drive – 2015
Old sidewalk, partially removedForms for new sidewalkNew sidewalkBefore and After
New Roofs for Buildings – 2015
Shop and Maintenance Office, old roof removedWest Pool House, roof being stripped
Sidewalk Bridge with Hand Rails over Drainage, Near West Townhouse Lane and Belt Line Road – 2015
Old bridge, with erosionOld BridgeOld bridge removed, new blocks being setBlock walls and fill areas. Block wall filled with concrete and rebars, hand rail postsBlock walls, new sidewalk rebars, handrail posts set into concreteNew sidewalk surface prior to finishingCompleted bridge over drainage, with handrails. The blue stuff is grass seeds. We used the old broken up concrete from old bridge to prevent washouts
New Windows for the Office – 2014
New Door and Windows, left frontNew windows, right frontNew Door and windows, left rearNew windows, right rear
New Pool Fence -2014
RearSouth SideEast SideNorth SideRear
East Mountain Creek Court – Storm Drain Fence, Handrails and Retaining Wall – 2014
Old wooden retaining wallNew retaining wall, re-bar secured with concreteFilled concrete blocks, with handrail posts
Handrail 1
Fence and Handrail, completed
West Creek Lane Paving – 2014
Day 1Day 1
Both sections poured. Will be ready on January 26 for traffic.
my name is carol Evans 27 W Townhouse Ln i turned in request to get the face trim painted 2 1/2 yrs ago and it never got done who do i need to talk with
Hey Carol, we looked and cannot find any record of this request. Did you have a work order made or just call it in?
Upon further inspection, it appears a cable was removed and that is what peeled the paint on the Soffit and fascia boards. We need to see if we have any of that paint still.