We will have a work crew on East Mountain Creek Court tomorrow, as evidenced by the equipment they staged this evening (right). The machine to the right is a Ditch Witch type machine, so they can insert conduits (electrical piping) between the transformers along the East MC Court area and connect to East MC Drive. They will be all over the area and it will be somewhat loud.
The object of installing underground conduit is to make the cable changes between transformers much easier than having to trench them all up as they have done previously.