{"id":3092,"date":"2018-07-12T09:22:59","date_gmt":"2018-07-12T15:22:59","guid":{"rendered":"http:\/\/gpmcha.org\/?p=3092"},"modified":"2018-07-12T09:22:59","modified_gmt":"2018-07-12T15:22:59","slug":"more-electrical-work-on-west-side-2","status":"publish","type":"post","link":"https:\/\/gpmcha.org\/?p=3092","title":{"rendered":"More Electrical Work on West Side"},"content":{"rendered":"<p>J&amp;S Underground Networks, Inc. and Pike Electric will be on property next week doing some extensive work on the underground electrical cables running across the entire West side of the property, from West Creek Lane to West Mountain Lane.<\/p>\n<p>They are replacing the feeder cables between transformers, and in some cases, the transformer itself. Most of these cables and some equipment are the original installed in the early 1970&#8217;s. Conduits will be installed with a hydraulic boring machine so they can more easily replace cables in future.<\/p>\n<p>They estimate they will be working for a little over a week.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>J&amp;S Underground Networks, Inc. and Pike Electric will be on property next week doing some extensive work on the underground electrical cables running across the entire West side of the property, from West Creek Lane to West Mountain Lane. They are replacing the feeder cables between transformers, and in some cases, the transformer itself. Most..<\/p>\n<p><a class=\"btn btn-default read-more\" href=\"https:\/\/gpmcha.org\/?p=3092\">Read more <span class=\"fa fa-angle-right\"><\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[3],"tags":[],"class_list":["post-3092","post","type-post","status-publish","format-standard","hentry","category-information"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":3112,"url":"https:\/\/gpmcha.org\/?p=3112","url_meta":{"origin":3092,"position":0},"title":"Utility Work on the West Side","author":"Don Ryan","date":"July 20, 2018","format":false,"excerpt":"J&S Underground Networks are starting work today to install conduits for new underground power cables. This work will be from West Creek Lane to West Mountain Lane between the transformers.\u00a0 If they are doing it like they did on the East side, they will get the new conduits and cables\u2026","rel":"","context":"In &quot;Information&quot;","block_context":{"text":"Information","link":"https:\/\/gpmcha.org\/?cat=3"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":3054,"url":"https:\/\/gpmcha.org\/?p=3054","url_meta":{"origin":3092,"position":1},"title":"Electrical Work on West Mountain Lane","author":"Don Ryan","date":"June 8, 2018","format":false,"excerpt":"Novimium, an Oncor contractor, will be doing some work on a transformer on Monday, June 11th. This will effect parts of West Mountain Lane. They will have the power back on as soon as they can. They are out here upgrading the transformers\/underground cables. And they will be changing iut\u2026","rel":"","context":"In &quot;Information&quot;","block_context":{"text":"Information","link":"https:\/\/gpmcha.org\/?cat=3"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":2259,"url":"https:\/\/gpmcha.org\/?p=2259","url_meta":{"origin":3092,"position":2},"title":"More Electrical Work on West Side","author":"Don Ryan","date":"February 23, 2017","format":false,"excerpt":"Oncor has been working on the West side of the property replacing some underground cables (between transformers). Yesterday they hit one of our water lines and a power cable with their excavator. They have already repaired our broken water pipe and are out again today to replace the damaged cable.\u2026","rel":"","context":"In &quot;Information&quot;","block_context":{"text":"Information","link":"https:\/\/gpmcha.org\/?cat=3"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":3615,"url":"https:\/\/gpmcha.org\/?p=3615","url_meta":{"origin":3092,"position":3},"title":"J&#038;S Underground working on East Mountain Lane","author":"Don Ryan","date":"September 13, 2019","format":false,"excerpt":"J&S, an ONCOR contractor, will be on the east side replacing underground cables from around 26 East Mountain Lane towards 14th Street, near the golf course. As most of you know, they have been on property several times replacing the old cables from the 1970's which have deteriorated. \u00a0 \u00a0","rel":"","context":"In &quot;ONCOR&quot;","block_context":{"text":"ONCOR","link":"https:\/\/gpmcha.org\/?cat=259"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/gpmcha.org\/wp-content\/uploads\/2019\/09\/JS-East.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1439,"url":"https:\/\/gpmcha.org\/?p=1439","url_meta":{"origin":3092,"position":4},"title":"Electrical Problems, West Side","author":"Don Ryan","date":"September 23, 2015","format":false,"excerpt":"There are some electrical problems on the West side, near the West Townhouse Lane area.\u00a0 I talked to the repair crew and it appears one of the underground supply wires is shorted out and blowing fuses on the pole.\u00a0 They will run a temporary wire until another crew can come\u2026","rel":"","context":"In &quot;Information&quot;","block_context":{"text":"Information","link":"https:\/\/gpmcha.org\/?cat=3"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":2888,"url":"https:\/\/gpmcha.org\/?p=2888","url_meta":{"origin":3092,"position":5},"title":"Oncor and Subcontractors on Property","author":"Don Ryan","date":"February 27, 2018","format":false,"excerpt":"We have Oncor and their subcontractors doing work on property on both sides. There is a crew on East Mountain Creek Court running some new cables between the transformers. There is also a temporary wire running across West Townhouse Lane. The operative word is \"temporary\". This wire will be buried\u2026","rel":"","context":"In &quot;Utility Work&quot;","block_context":{"text":"Utility Work","link":"https:\/\/gpmcha.org\/?cat=235"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"_links":{"self":[{"href":"https:\/\/gpmcha.org\/index.php?rest_route=\/wp\/v2\/posts\/3092","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gpmcha.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gpmcha.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gpmcha.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/gpmcha.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3092"}],"version-history":[{"count":1,"href":"https:\/\/gpmcha.org\/index.php?rest_route=\/wp\/v2\/posts\/3092\/revisions"}],"predecessor-version":[{"id":3093,"href":"https:\/\/gpmcha.org\/index.php?rest_route=\/wp\/v2\/posts\/3092\/revisions\/3093"}],"wp:attachment":[{"href":"https:\/\/gpmcha.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3092"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gpmcha.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3092"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gpmcha.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3092"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}