{"id":2902,"date":"2018-03-05T22:07:54","date_gmt":"2018-03-06T04:07:54","guid":{"rendered":"http:\/\/gpmcha.org\/?p=2902"},"modified":"2018-03-05T22:07:54","modified_gmt":"2018-03-06T04:07:54","slug":"utility-work-on-east-side","status":"publish","type":"post","link":"https:\/\/gpmcha.org\/?p=2902","title":{"rendered":"Utility Work on East Side"},"content":{"rendered":"<p><a href=\"https:\/\/i0.wp.com\/gpmcha.org\/wp-content\/uploads\/2018\/03\/20180305_183900.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" data-attachment-id=\"2903\" data-permalink=\"https:\/\/gpmcha.org\/?attachment_id=2903\" data-orig-file=\"https:\/\/i0.wp.com\/gpmcha.org\/wp-content\/uploads\/2018\/03\/20180305_183900.jpg?fit=4032%2C2268&amp;ssl=1\" data-orig-size=\"4032,2268\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;1.7&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;SM-G930V&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1520275140&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;4.2&quot;,&quot;iso&quot;:&quot;250&quot;,&quot;shutter_speed&quot;:&quot;0.0416666666667&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"20180305_183900\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/gpmcha.org\/wp-content\/uploads\/2018\/03\/20180305_183900.jpg?fit=1024%2C576&amp;ssl=1\" class=\"wp-image-2903\" src=\"https:\/\/i0.wp.com\/gpmcha.org\/wp-content\/uploads\/2018\/03\/20180305_183900-1024x576.jpg?resize=684%2C385\" alt=\"\" width=\"684\" height=\"385\" srcset=\"https:\/\/i0.wp.com\/gpmcha.org\/wp-content\/uploads\/2018\/03\/20180305_183900.jpg?resize=1024%2C576&amp;ssl=1 1024w, https:\/\/i0.wp.com\/gpmcha.org\/wp-content\/uploads\/2018\/03\/20180305_183900.jpg?resize=300%2C169&amp;ssl=1 300w, https:\/\/i0.wp.com\/gpmcha.org\/wp-content\/uploads\/2018\/03\/20180305_183900.jpg?resize=768%2C432&amp;ssl=1 768w, https:\/\/i0.wp.com\/gpmcha.org\/wp-content\/uploads\/2018\/03\/20180305_183900.jpg?w=2000&amp;ssl=1 2000w, https:\/\/i0.wp.com\/gpmcha.org\/wp-content\/uploads\/2018\/03\/20180305_183900.jpg?w=3000&amp;ssl=1 3000w\" sizes=\"auto, (max-width: 684px) 100vw, 684px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>We will have a work crew on East Mountain Creek Court tomorrow, as evidenced by the equipment they staged this evening (right). The machine to the right is a Ditch Witch type machine, so they can insert conduits (electrical piping) between the transformers along the East MC Court area and connect to East MC Drive. They will be all over the area and it will be somewhat loud.<\/p>\n<p>The object of installing underground conduit is to make the cable changes between transformers much easier than having to trench them all up as they have done previously.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; We will have a work crew on East Mountain Creek Court tomorrow, as evidenced by the equipment they staged this evening (right). The machine to the right is a Ditch Witch type machine, so they can insert conduits (electrical piping) between the transformers along the East MC Court area and connect to East MC..<\/p>\n<p><a class=\"btn btn-default read-more\" href=\"https:\/\/gpmcha.org\/?p=2902\">Read more <span class=\"fa fa-angle-right\"><\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[235],"tags":[],"class_list":["post-2902","post","type-post","status-publish","format-standard","hentry","category-utility-work"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":2915,"url":"https:\/\/gpmcha.org\/?p=2915","url_meta":{"origin":2902,"position":0},"title":"Recent Utility Work","author":"Don Ryan","date":"March 11, 2018","format":false,"excerpt":"Oncor's subcontractors were on the East side (East MC Court area) for a little over a week and appear to have completed the work they were doing. As a result, there are piles of dirt near the transformers and other areas they excavated and a lot of the grass isn't\u2026","rel":"","context":"In &quot;Utility Work&quot;","block_context":{"text":"Utility Work","link":"https:\/\/gpmcha.org\/?cat=235"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/gpmcha.org\/wp-content\/uploads\/2018\/03\/Dirt-piles-300x206.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":3112,"url":"https:\/\/gpmcha.org\/?p=3112","url_meta":{"origin":2902,"position":1},"title":"Utility Work on the West Side","author":"Don Ryan","date":"July 20, 2018","format":false,"excerpt":"J&S Underground Networks are starting work today to install conduits for new underground power cables. This work will be from West Creek Lane to West Mountain Lane between the transformers.\u00a0 If they are doing it like they did on the East side, they will get the new conduits and cables\u2026","rel":"","context":"In &quot;Information&quot;","block_context":{"text":"Information","link":"https:\/\/gpmcha.org\/?cat=3"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":2888,"url":"https:\/\/gpmcha.org\/?p=2888","url_meta":{"origin":2902,"position":2},"title":"Oncor and Subcontractors on Property","author":"Don Ryan","date":"February 27, 2018","format":false,"excerpt":"We have Oncor and their subcontractors doing work on property on both sides. There is a crew on East Mountain Creek Court running some new cables between the transformers. There is also a temporary wire running across West Townhouse Lane. The operative word is \"temporary\". This wire will be buried\u2026","rel":"","context":"In &quot;Utility Work&quot;","block_context":{"text":"Utility Work","link":"https:\/\/gpmcha.org\/?cat=235"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":3279,"url":"https:\/\/gpmcha.org\/?p=3279","url_meta":{"origin":2902,"position":3},"title":"Water Leak on East MC Court","author":"Don Ryan","date":"December 16, 2018","format":false,"excerpt":"We have another water leak at the City water meter located in the common area across from #40 East MC Court. Our guys are working on it now and we will have the water back on as soon as possible.\u00a0This is a 2\" connection leaking at a rate of about\u2026","rel":"","context":"In &quot;Information&quot;","block_context":{"text":"Information","link":"https:\/\/gpmcha.org\/?cat=3"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/gpmcha.org\/wp-content\/uploads\/2018\/12\/11632-1-169x300.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2709,"url":"https:\/\/gpmcha.org\/?p=2709","url_meta":{"origin":2902,"position":4},"title":"New Pergola on East Side","author":"Don Ryan","date":"November 16, 2017","format":false,"excerpt":"Next to where the old tennis court was, (behind the shop area) there was a wooden pergola with 2 benches. It has been there for a very long time, and was rotten. It was taken down several months ago and today we began replacing it with pressure treated wood. We\u2026","rel":"","context":"In &quot;Information&quot;","block_context":{"text":"Information","link":"https:\/\/gpmcha.org\/?cat=3"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/gpmcha.org\/wp-content\/uploads\/2017\/11\/Pergola-1024x576.jpg?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/gpmcha.org\/wp-content\/uploads\/2017\/11\/Pergola-1024x576.jpg?resize=350%2C200 1x, https:\/\/i0.wp.com\/gpmcha.org\/wp-content\/uploads\/2017\/11\/Pergola-1024x576.jpg?resize=525%2C300 1.5x, https:\/\/i0.wp.com\/gpmcha.org\/wp-content\/uploads\/2017\/11\/Pergola-1024x576.jpg?resize=700%2C400 2x"},"classes":[]},{"id":3629,"url":"https:\/\/gpmcha.org\/?p=3629","url_meta":{"origin":2902,"position":5},"title":"Another water leak, East Side","author":"Don Ryan","date":"September 24, 2019","format":false,"excerpt":"We have a leak on East Creek Drive which we will repair after lunch. To fix it, we will shut off the water which will impact East Creek Drive, 1 - 15 (odd numbers only), and the 2 story houses on East MC Court facing 14th.","rel":"","context":"In &quot;Water Repairs&quot;","block_context":{"text":"Water Repairs","link":"https:\/\/gpmcha.org\/?cat=92"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"_links":{"self":[{"href":"https:\/\/gpmcha.org\/index.php?rest_route=\/wp\/v2\/posts\/2902","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gpmcha.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gpmcha.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gpmcha.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/gpmcha.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2902"}],"version-history":[{"count":3,"href":"https:\/\/gpmcha.org\/index.php?rest_route=\/wp\/v2\/posts\/2902\/revisions"}],"predecessor-version":[{"id":2906,"href":"https:\/\/gpmcha.org\/index.php?rest_route=\/wp\/v2\/posts\/2902\/revisions\/2906"}],"wp:attachment":[{"href":"https:\/\/gpmcha.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2902"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gpmcha.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2902"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gpmcha.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2902"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}